You don't have javascript enabled. Good luck with that.
Pencarian
Bus AKAP dari Luar Jakarta Jalani Ramp Check di Terminal Terpadu Pulogebang

AKAP Buses Undergo Ramp Check Upon Arriving at Pulo Gebang Bus Terminal

The Ujung Menteng Motor Vehicle Testing Service Unit (UP PKB), East Jakarta conducted a ramp check on intercity interprovincial (AKAP) buses that arrived at Pulo Gebang Integrated Bus Terminal.

We routinely check all AKAP buses which have arrived at the terminal to create a sense of security and comfort for passengers and bus crews during the trip

Ramp check was conducted to ensure the AKAP buses were in prime condition or roadworthy before returning to transport the passengers.

Ujung Menteng UP PKB Supervisory Examiner Zulkifli said that the ramp check consisted of major and minor checks. His side checked the engine, tires, brakes, lights, and other technical parts of engine for major check.

Dishub Deputy Head Monitors Homecoming Flow at Kampung Rambutan Terminal

Meanwhile the minor checks consisted of checking seat belts, passenger seats, toilets, shifting gears, and steering wheel.

"We routinely check all AKAP buses which have arrived at the terminal to create a sense of security and comfort for passengers and bus crews during the trip," he mentioned, Saturday (5/7).

He explained that if the bus failed the test, they would be advised not operate while waiting for the bus company (PO) to repair it. However, his side had not find any fatal findings on AKAP buses so far.

"We only found relatively small or minor problems and were immediately handled by the related PO. We appreciate POs that have been cooperative in complying with all regulations and provisions," he uttered.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye895 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye647 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye637 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye570 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye554 personFakhrizal Fakhri